Securing Campuses

  • Project Description:
    Safety of students, employees, and visitors is a top priority for ÃÛÌÒ´«Ã½. Capital projects continue to address areas that can improve the safety of campuses.

    Since 2013, ÃÛÌÒ´«Ã½ has invested over $5 million in school safety and security-driven improvements including:

    • Structural updgrades for access control to 15 schools,
    • 29 computerized visitor management systems,
    • District-wide proximity card/ID badge system with more than 400 electronic, networked door locks,
    • 31 fully digital school video surveillance systems featuring over 1,200 cameras,
    • 110 school bus cameras with GPS capability,
    • Over 500 new digital radios, and
    • More than 8,000 linear feet of security fencing and access control gates

    Projected Completion:
    Ongoing

    Rock Hill High School
    Fencing to control pedestrian access to the interior of campus

    rhhs exterior access control
    The project will begin soon and is expected to be completed in December 2018. Once finished, all guests to our campus will enter through our new welcome center on the corner of B Building in the space that is currently home to vending machines. Additionally, the front courtyard will be enclosed with ornamental fencing connecting C and B Buildings that will direct guests to the new welcome center. The red line in the image highlights the placement of access control fencing. The welcome center will be on the corner of C Building (top right of image).


    Applied Technology Center
    Fencing and card-only access entry gate

     


    Northwestern High School
    Fencing to control pedestrian access to the interior of campus

     nwhs exterior access control
    The project will begin soon and is expected to be completed in December 2018. Once finished, all guests to our campus will enter through our new welcome center on the corner of E Building. The breezeway between D and E Buildings will be closed with an access control gate similar to what was added in 2016 to other areas of our campus. Included in this work will be Americans with Disabilities Act improvements to the breezeway between D and E Buildings. The red lines in the image highlights the access control fencing. The welcome center entrance would be near the window that is viewable on the right side of the image.


About Our Camera System

  • SRO - Rawlinson Road MS

    Lesslie FD